Kunjiang hydropower Station

PubDate:2018-07-31Author:Sources:Views:8060

The Kungiang 2 Hydropower Project in Vietnam consists of two cascade power stations:


The main structures of the first-level power station hub are roller concrete on the left and right banks, earth gravity dam of the first-level power station, roller compacted concrete free spillway dam and diversion plant. Two horizontal mixed-flow units are installed in this cascade power station, with a total installed capacity of 3MW.


The main structures of the secondary power station are spillway controlled by 4-hole curved gate with 44m long free spillway, diversion plant, diversion tunnel about 5155.24m long. Three vertical mixed-flow units are installed in this cascade power station, with a total installed capacity of 60MW.



漳平市| 景东| 咸阳市| 洛川县| 舟曲县| 广德县| 师宗县| 黑山县| 四川省| 平舆县| 抚顺市| 马山县| 昌吉市| 曲麻莱县| 阿瓦提县| 黄浦区| 凤城市| 门头沟区| 滨州市| 万源市| 岑巩县| 阿拉尔市| 静宁县| 科尔| 佛学| 兰坪| 伊吾县| 西乡县| 巴青县| 广安市| 水富县| 始兴县| 犍为县| 长葛市| 拜泉县| 西丰县| 临汾市| 友谊县| 大兴区| 玉门市| 来安县|